Our Projects
Discover our projects in IRM, Fabrication, CNC and Asset Management.
- 
    
    
Wellhead Adapter - 
    
    
Well Neck Flange - 
    
    
Rollers - 
    
    
Rollers - 
    
    
Manifold Block - 
    
    
Flanges - 
    
    
End Cover - 
    
    
Drilling Tool - 
    
    
Double Connection Block - 
    
    
Cuplling - 
    
    
Adapters - 
    
    
Adapter - 
    
    
Manifold Mudmat Weight: 300 tons - 
    
    
Pipe-Lay Equipment for Pyrenees Field Development - 
    
    
Material Handling Equipment for Semi-Sub Rig : BOP Carrier - 
    
    
Material Handling Equipment for Semi-Sub Rig : BOP Transporter and Crane - 
    
    
Gooseneck Handling Frame Assbly Indonesia Jangkrik Field - 
    
    
Fabrication of FLET Suction Pipe - 
    
    
Fabrication of FLET Modules (Total: 4 Sets) c/w Handling Frame - 
    
    
Fabrication of Goosenecks 8", 11.4" & 12" Total: 44 Sets - 
    
    
Wet Parking Stands Indonesia Bangka Field - 
    
    
Fabrication of 9.5 Inch Gooseneck - 
    
    
Fabrication of Pig Launcher & Receiver - 
    
    
Fabrication of Pipeline End Manifold (PLEM) - 
    
    
Fabrication of Mid Water Arch - 
    
    
Fabrication of Subsea Isolation Valve Modules - 
    
    
Fabrication of Subsea Manifold Dual-Header 6-Slot - 
    
    
Fabrication & Load-Out Living Quarters for Jack-Up Rigs Total : 6 Rig Sets @ 500 Tons Per Rig Set - 
    
    
Fabrication of New Rooms FPSO Kaombo - 
    
    
Fabrication & Load-Out of Subsea Mid-Water Arches & Gravity Bases for Indonesia Janggrik Project (Total: 2000 Tons) - 
    
    
Fabrication Subsea FLET Suction Pile - 
    
    
Fabrication & Load-Out for Bangka Project - 
    
    
Fabrication & Load-out New Zealand OMV Project - 
    
    
Fabrication & Mobilization OSV "Skandi Hercules" for Vietnam Bien Dong Phase 1 Project - 
    
    
Chain Flacking & Mobilization OSV "Skandi Hercules" for Indian ONGC D1 Mooring Chains 120mm (Total: 2400T)Mob/Demob & Storage
 - 
    
    
Fabrication & Installation OSV "Sapura 3000" for Australia Gorgon Project - 
    
    
Fabrication & Mobilization HLV "Clipper Galaxy" for Angola CLOV Project - 
    
    
Bulbous Bow Damage Repair - 
    
    
MV "Sapura Constructor" (GT: 8337, LOA: 118m) Discharging OperationMob/Demob & Storage
 - 
    
    
HLV "Stellaprima" (GT: 6902, LOA: 100m) Discharging Operation - 
    
    
M/V "Ingrid C" (GT: 33044, LOA: 190m) Deck Crane Repair - 
    
    
M/T "Alia" (GT: 23676, LOA: 183m) Ship Repair - 
    
    
Repair & Stacking Semi-Submersible Barge "Giant 5"Upgrades & SPS
 - 
    
    
Preservation & Stacking Tender Assist "SKD T-12"Lay-up
 - 
    
    
Mobilization/Fabrication/Installation Pipelay Vessel "Star Centurion" for Ghana OCTP Development ProjectMob/Demob & Storage
 - 
    
    
Stacking Jack-Up Barge "Energi 1"Lay-up
 - 
    
    
Removal of Grillages HLV "Bigroll Beaufort"Mob/Demob & Storage
 - 
    
    
Removal of Grillages HLV "Biglift Baffin"Mob/Demob & Storage
 - 
    
    
De-mobilization OSV "Skandi Singapore" for Vietnam Lamson ProjectMob/Demob & Storage
 - 
    
    
Preservation, Stacking & Reactivation of a few vessels (T12, T20, Energi1 & Loch Seaforth)Lay-up
 - 
    
    
Preservation, Stacking & Reactivation Semi-Sub Tender "SKD Alliance"Lay-up
 - 
    
    
Demobilization OSV "Southern Ocean"Mob/Demob & Storage
 - 
    
    
Fabrication & Load-out HLV "Industrial Strength" for Angola Kaombo Project - 
    
    
Fabrication & Load-out HLV "BBC Vela" for Angola Kaombo Project - 
    
    
Fabrication & Loadout Helideck for Kaombo Project - 
    
    
Refurbishment & Load-Out AHTS "Logindo Braveheart" for Janggrik Project - 
    
    
Float-Out, Preservation & Stacking Semi-Tender "West Setia"Lay-up
 - 
    
    
Preservation, Stacking & Reacivation Jack-Up Rig "Rani Woro"Lay-up
 - 
    
    
440-Pax Floatel Assembly & Installation of Cabins - 
    
    
3000-Ton Capacity Modular Cable Carousel System Fabrication & Installation - 
    
    
Subsea Habitat for Diving Support Weight: 75 tons - 
    
    
Holdback Anchor Riser for Gumusut Kakap Field Dia. 9.6m Weight: 105 tons - 
    
    
Spreader Frames for CLOV Angola Field - 
    
    
Spreader for Tied-In Spools for Gorgon Field - 
    
    
Spuds for Dredger Length : 40m Weight : 150 tons - 
    
    
Decommissioning of Navigation, Control & Communication Buoy (Total: 450 Tons)Decommissioning
 - 
    
    
Refurbishment & Load-Out of Pipe-lay Stinger for Pipelay Vessel "Norce Endeavour" - 
    
    
Project Cargo Handling Cameron BOPMob/Demob & Storage
 - 
    
    
Preservation & Stacking Tender Rig "SKD T-20"Lay-up
 - 
    
    
Engine Repair Bulker "Vine 2" - 
    
    
Fabrication & Mobilization MPV "Bourbon Evolution 803" for Terengganu, Malaysia - 
    
    
Pedestal Crane Repair Bulker "Tenora" (GT: 13409, LOA: 164m) - 
    
    
Stacking, Upgrading & Mobilization Semi-Sub Rig "Songa Eclipse"Upgrades & SPS
 - 
    
    
Stacking, Upgrading & Mobilization Semi-Sub Rig "Island Innovator"Upgrades & SPS
 - 
    
    
Float-Out, Preservation, Stacking & Reactivation Semi-Tender "SKD Esperanza"Lay-up
 - 
    
    
Preservation & Stacking Semi-Tender "SKD Menang"Lay-up
 - 
    
    
Float-Out, Preservation, Stacking & Reactivation Semi-Tender "SKD Berani"Lay-up
 - 
    
    
STACKING, UPGRADING & MOBILIZATION JACK-UP RIGS "COSL BOSS" & "COSL SEEKER"Upgrades & SPS